BizDocs Studio
Handyman Contract & Forms Pack, 11 editable Word and PDF documents

Handyman Contract & Forms Pack, 11 editable Word and PDF documents

Word & PDF

Handyman Contract & Forms Pack

The agreement, work order, estimate, change order and invoice a handyman uses every week.

$11one-time, USD
  • Instant download · ZIP: 11 editable Word (.docx) files + PDF versions
  • 14-day refund, no questions asked
  • Personal and business use license
  • Free updates to this version

Works with

  • Microsoft Word 2010 or newer
  • Google Docs (upload, Open with Google Docs)
  • Apple Pages
  • Any PDF viewer and e-signature tool

Made for: Handyman businesses and solo operators, Property maintenance techs, Home repair franchises, Anyone doing paid repairs without a contract today.

What is inside

10 documents, one matching set

Handyman contract templates that cover the whole job: a service agreement with licensing limits written in, an estimate, a work order for each visit, a change order, an invoice, a completion sign-off and a workmanship warranty certificate. Editable Word files with PDF versions.

  1. 1

    Handyman Service Agreement

    Three pages as shipped, nine clauses: scope with a hidden-condition stop rule, pricing at $[85] an hour with a one-hour minimum and [15]-minute increments, a $[45] trip fee, a [30]% deposit on jobs over $[500], materials at cost plus [15]%, cancellation, five exclusions, a [90]-day labor warranty, damage and insurance, permits, general terms. Schedule A has eight task lines.

  2. 2

    Work Order / Job Ticket

    One page as shipped, filled in on site: work order number, technician, time in and out and travel miles; five task rows with hours, rate and amount; three materials rows; totals for labor, marked-up materials, trip fee and the visit; a notes box for follow-ups; and a client line confirming the work was done to their satisfaction.

  3. 3

    Estimate

    One page as shipped, with a number and 14-day validity. Four sample lines show the format, such as a client-supplied faucet at 1.5 hours, with materials shown including the markup, plus two blank rows. Totals cover labor, materials, trip fee and sales tax on materials. Four notes cover the [10]% overrun warning, client parts, like-for-like electrical only and the warranty.

  4. 4

    Change Order

    One page as shipped, with a [Change Order Number], tied to the work order. Four reason ticks: client request, hidden condition, code or safety requirement, material unavailable. Three work rows with hours, rate and materials, then original total, earlier change orders, this change, revised total and schedule impact. A text reply of 'approved' with the change order number also counts.

  5. 5

    Invoice

    One page as shipped that names the work order, service date and technician. Lines for labor at $[85], materials with receipts plus [15]% and the $[45] trip fee, then subtotal, sales tax on materials, deposit deducted and amount due. Three ways to pay, and a footer restating the [90]-day warranty and the late fee after [10] days.

  6. 6

    Client Intake & Property Access

    One page as shipped, in four sections: contact; property type with a rental owner-approval tick, year built with a pre-1978 lead paint note, parking and shut-off locations; access codes, alarm and pets; and the job, with a task list, photos sent, who buys materials, preferred dates and four budget bands from under $250 to over $1,000.

  7. 7

    Scope Limitations & Acknowledgment

    One page as shipped, which the client signs before work starts. Seven sections: licensing limits with your registration number and state dollar limit, permits, older homes with an EPA RRP lead-paint note and an is or is not certified choice, existing conditions, client-supplied materials, the warranty wording, and keeping children and pets away from tools and ladders.

  8. 8

    Completion Sign-off

    One page as shipped: a five-row walkthrough with a Complete box and punch-item notes, four site checks (debris removed, tools out, water and power restored and tested, warranty certificate handed over), an optional 1 to 5 rating with a would-you-refer-us tick and comments line, and an acceptance statement both sides sign.

  9. 9

    Service Policies

    A handout, one page as shipped, in six sections: pricing (hourly rate, minimum, trip fee, markup, [14]-day estimates), scheduling with a [2]-hour arrival window and free cancellation with [24] hours' notice, what we do plus the five exclusions written as 'We do not' sentences, the warranty, payment and late fees, and care of the home.

  10. 10

    Workmanship Warranty Certificate

    One page as shipped, to hand over with the invoice. Fields for work order and invoice numbers, completion date and a [90]-day period with its end date, a four-row covered-work table, a claim process with a photo and a visit scheduled within [3] business days, four exclusions including paint-match variation, and a signature line.

Details

What you can count on

  • Plain-English clauses under numbered headings that a homeowner will actually read and sign
  • Placeholders are yellow and come in three kinds: named placeholders such as [Your Company Name] and the licensed, insured and bonded line are safe to change with Find & Replace (Replace All), one file at a time; the hourly rate, trip fee, markup, warranty days and state limit are bracketed sample values you review one by one; a bracket with a slash is a choice
  • Licensed-trade exclusions appear in the agreement, the acknowledgment and the policies handout
  • Hidden-condition clause stops the job and turns surprises into a numbered written change order
  • A client signature at every step: agreement, acknowledgment, estimate, work order, change order and completion sign-off
  • The [Work Order Number] placeholder carries through the change order, invoice and warranty certificate
  • Every form except the agreement and Start Here guide is one page as shipped
  • Word files for editing, plus a PDF of every form ready to send or e-sign
  • Start Here guide with seven suggested defaults, from hourly rate to the state handyman limit

Last updated November 18, 2026. Buyers get updates to this version free, by email.

Questions

Before you buy

Does this cover my state's handyman rules?

The agreement and acknowledgment have a placeholder for your state's handyman limit and licensing wording, and the Start Here guide reminds you to confirm the limit with your state contractor board. Rules differ by state and city, so confirm yours with the state contractor board or a local attorney. Not legal advice.

Can I edit them in Google Docs or Pages?

Yes. Upload a .docx to Google Drive and choose Open with Google Docs, or open it in Apple Pages. Tables, checkboxes and highlights carry over. PDF versions are included for sending.

Flat fee or hourly?

Both. The agreement and its Schedule A let you tick flat fee per task or time & materials with a one-hour minimum charge. The estimate is laid out for time & materials, with hours, rate and materials on each line, and the work order records actual hours either way.

How do I add my logo and remove the yellow highlights?

Click into the header block and Insert > Picture for your logo. Replace each yellow placeholder with your text; remove the highlight when you are done or leave it until the final copy. The forms leave room for a long business name and address; very long entries can add a page.

What if it is not what I need?

Email us within 14 days and we refund you. No forms, no questions.

In what order do the forms go to a client?

Intake form when they first call, then the estimate. To book, they sign the agreement and the scope acknowledgment and get the policies handout. On site you fill in a work order, add a change order if something turns up, close with the completion sign-off, then send the invoice with the warranty certificate.

Can clients sign electronically?

Yes, using a tool you already have. The files are ordinary Word and PDF documents: save as PDF, upload to your e-signature service and place fields on the signature lines. We do not supply a signing service. The change order also accepts a text or email reply as approval.

What does the workmanship warranty cover?

Your labor for [90] days: if a repair fails because of your workmanship, you return and fix it at no labor charge. It excludes materials, client-supplied parts, normal wear, water intrusion, settling, pre-existing conditions and work you advised against. You can change the period in the agreement and certificate.

What does the pack say about lead paint in older homes?

The intake form asks the year the home was built. The acknowledgment says that homes built before 1978 may contain lead paint and that work disturbing painted surfaces follows the EPA Renovation, Repair and Painting (RRP) rule as applicable law requires, and lets you mark whether your company is RRP certified. Asbestos and mold are referred to specialists.

Handyman Contract & Forms Pack

$11 one-time · instant download · 14-day refund