BizDocs Studio

Templates for contractors and remodelers

A small contracting business runs on five pieces of paper: the estimate, the proposal the client signs, the change order when scope moves, the job cost record that tells you whether you made money, and the invoice. Most contractors keep these in five different places, which is why margins leak.

The templates below are built to hand off to each other. The estimate prices every line from your real overhead and profit, the proposal and change order pull from it, the job cost tracker compares the budget to what you actually spend, and the invoice tracker makes sure the money arrives.

Use them in job order. Price the work in the estimate, turn it into a proposal the client signs, put every change in writing when it happens, compare cost with budget while the job is still running, and bill on the schedule the contract set. A contractor who only does the first and last steps finds out about a losing job after it is finished.

Templates

Paperwork checklist: contractors

DocumentWhy you need itTemplate
Estimate with overhead and profitPrices the job from costs, not guesses; the basis for every other document. Estimate & Bid · $16
Client proposal / bidWhat the client signs: scope, price, schedule, payment terms. No internal costs shown. Estimate & Bid · $16
Change orderWritten approval and price for any change in scope before the work is done. Estimate & Bid · $16
Job cost recordBudget vs actual by cost code so you catch a losing job while it is still running. Job Cost Tracker · $13
Invoice and payment logDeposits, progress billing and final invoice with an overdue list. Invoice Tracker · $7
Lien waiverRequired by many lenders and owners at each payment; state-specific forms.Not included (state-specific)
Detailed proposal with scope and exclusionsOn remodels and additions the argument is rarely about the price; it is about what the price included. Scope by phase, exclusions and allowances settle that before anyone signs. Construction Proposal Kit · $16
Change order logOne change order is a form; ten are a ledger. A log with the running contract sum and completion date keeps the final invoice from being a surprise. Change Order Form & Log · $9
Progress billing with retainageJobs paid in stages need a schedule of values, percent complete for each period and retainage tracked through to the last draw. Progress Billing · $17

Guides

Questions

Which template should a new contractor start with?

The estimate. Every other document is built from it, and pricing from real overhead and profit is the single biggest margin lever. The Contractor Toolkit Bundle adds job costing and invoice tracking for about 30% less than buying each one.

Do these work in Google Sheets?

Yes. The Excel workbooks use standard functions only (no macros), so they import into Google Sheets with formulas intact.

Are the contracts valid in my state?

They are plain-English templates with your state, license number and terms as placeholders. Contractor rules vary by state, so have a local attorney review before use. Not legal advice.

What is the difference between an estimate and a proposal?

An estimate is your internal pricing: quantities, unit costs, markup, overhead and profit. A proposal is what the client reads and signs: scope, exclusions, price, payment schedule and terms. Build the estimate first and let the proposal carry the scope and the totals, not your costs.

When do I need progress billing instead of a simple invoice?

When a job runs longer than a month, is paid in draws or has retainage. Progress billing invoices each period for the work completed against a schedule of values and keeps a running record of what has been billed, paid and held back.