BizDocs Studio
Job Cost Tracker for Contractors, Excel and Google Sheets

Job Cost Tracker for Contractors, Excel and Google Sheets

Excel & Google Sheets

Job Cost Tracker for Contractors

Compare each job's budget with what you actually spend, by cost code, while the job is still running.

$13one-time, USD
  • Instant download · Excel workbook (.xlsx), opens in Google Sheets
  • 14-day refund, no questions asked
  • Personal and business use license
  • Free updates to this version
Or get it in the Contractor Toolkit Bundle · $21

The estimate, job cost tracker and invoice tracker for contractors, sold together for less. $36 if bought separately.

Works with

  • Microsoft Excel 2010 or newer
  • Google Sheets (File > Import)
  • Excel for Mac
  • No macros, no add-ins

Made for: General contractors and remodelers, Specialty trades running several jobs at once, Owner-operators who bid fixed price, Anyone who finds out a job lost money only at tax time.

What is inside

7 tabs, one linked system

A job costing spreadsheet that shows whether each job is making money while it is still running. Set a budget by cost code, log hours and receipts, record change orders and invoices, and the dashboard compares budget to actual and flags any job slipping under your target margin. Excel and Google Sheets.

  1. 1

    Settings

    Company name and target gross margin (30% in the sample), which colors each job's projected margin on the Dashboard. Overhead % feeds the net-after-overhead line. Default labor burden % is used for any crew row whose burden is left blank. Seven cost categories: Labor, Materials, Subcontractors, Equipment & tools, Permits & fees, Dumpster & disposal, Other. Up to 10 crew members with hourly rate, burden % and loaded rate.

  2. 2

    Jobs

    15 job rows: job ID, name or client, address, start date, target end, status (Bidding, Active, On hold, Complete, Closed, plus a spare slot for your own) and contract value before sales tax. A job still marked Bidding stays on the Dashboard's job table but is left out of its revenue, cost and profit totals. Seven budget columns, one per cost category, add up to a total budget per job; their headers follow the category names in Settings. Budget is the cost you expect to spend; change orders stay on their own tab. A check counts rows with a blank or repeated job ID, a status not on the list, or no contract value.

  3. 3

    Time Log

    500 rows: date, job ID and worker from dropdowns, hours and a task note. The worker's loaded rate is looked up from the crew table and multiplied by hours, so a $48 rate with 25% burden costs $60 an hour. Hours with no worker show a red 'No worker' flag, and a name not on the crew list or a crew row with no hourly rate shows 'No rate', instead of costing $0 quietly. Counters at the top of the tab show how many rows need fixing, including rows with a blank or unknown job ID. Hours and labor cost totals sit at the top of the tab, with filters on every column.

  4. 4

    Costs

    400 rows, one per receipt or sub invoice: date, job ID, category, vendor, amount, receipt number and description. The category dropdown leaves out Labor, which comes only from the Time Log, so labor is never entered twice. Counters flag rows with a blank or unknown job ID or category. The sample has 28 costs across three jobs, from a dumpster to a quartz slab deposit.

  5. 5

    Change Orders

    50 rows: date, job ID, change order number, description, price to client before sales tax, estimated added cost and status (Pending, Approved, Rejected, plus a spare slot). Counters flag rows with a blank or unknown job ID or status. Only Approved rows count: the price is added to the job's revenue and the added cost to its budget on the Dashboard. Pending and Rejected rows move no totals.

  6. 6

    Billing

    100 rows for invoices and payments by job: date, job ID, invoice number, description, amount invoiced and amount received, both before sales tax, and date received. Invoiced, received and outstanding totals sit at the top of the tab, with a counter for rows with a blank or unknown job ID. The Dashboard reads these rows to compare what you have billed and collected with what the work has earned so far.

  7. 7

    Dashboard

    Eight KPIs: revenue with approved change orders, cost to date, projected gross profit, projected margin, invoiced, received, outstanding, hours. Revenue, cost and profit leave out jobs still Bidding. A 15-row job table from contract through projected margin %, % complete by cost and earned to date, with a net-after-overhead line, a line for jobs still Bidding, and a check that turns red if any cost or approved change order has no valid job ID (blank, unknown or used twice). Pick a job for budget vs actual by category and billing status: earned, invoiced, received, over or under billed, left to bill. Revenue vs cost chart of all 15 job slots.

Details

What you can count on

  • Hours become loaded labor cost automatically: hourly rate x (1 + burden %) from the crew table, times hours
  • Projected margin per job: revenue minus the larger of budget and cost to date, so a half-finished job never looks more profitable than it is
  • Red below your target margin, green at or above it; cost flagged red when it passes the job's budget
  • Approved change orders flow into revenue and budget without retyping; pending ones are not counted
  • Budget vs actual by cost code for any job you pick from a dropdown, with a line for costs that match no category
  • Earned vs invoiced vs received: catch under-billing before cash runs short; a finished job counts as fully earned
  • Dropdowns reject job IDs, workers and categories that are not on your lists, so typos cannot hide cost
  • Seven cost categories that line up with the six in our Contractor Estimate template, with Dumpster & disposal split out
  • Sample data: a bath, a kitchen and a deck job with 46 time entries, 28 costs and 7 invoices. The finished bath closes at 30.4% margin, just above the 30% target; the two active jobs project below it and show red
  • 1328 formulas, all visible and editable, nothing protected; sample results re-derived from the raw entries to the cent

Last updated November 20, 2026. Buyers get updates to this version free, by email.

Questions

Before you buy

How many jobs and entries does it hold?

15 jobs, 500 time entries, 400 cost lines, 50 change orders and 100 invoices per file. Start a new file each year or per division; nothing is locked if you want to extend ranges.

Does it work in Google Sheets?

Yes. File > Import > Upload the .xlsx. Dropdowns, conditional formatting and the chart carry over. All formulas are Sheets-compatible; no macros. Margin flags and chart included, it was tested in Google Sheets after import.

How is labor cost calculated?

Each crew member has an hourly rate and a burden % (payroll taxes, insurance, benefits) in Settings; a blank burden uses the default burden %. The Time Log looks up the loaded rate (rate x (1 + burden)) and multiplies by hours. Mike D. at $48 with 25% burden costs $60 an hour. Rates are looked up live, so changing a rate re-prices hours already logged under that name; after a raise, add a new crew row instead of editing the old one.

Does it replace my estimate?

No, it tracks against it. Enter your estimate's cost by category as the job budget and its price before sales tax as the contract value. Our Contractor Estimate & Bid Template uses six categories and this tracker seven: the same groups, slightly renamed, plus Dumpster & disposal. Rename either list in Settings if you want the names identical.

What if it is not what I need?

Email us within 14 days and we refund you. No forms, no questions.

How are % complete and earned revenue worked out?

% complete is cost to date divided by budget. Earned to date is revenue times that %, capped at 100%; a job marked Complete or Closed counts as fully earned, and a job with no budget entered shows No budget for its budget, % complete, earned to date and over or under billing, even when it has change orders, costs or invoices. Over or under billed is invoiced minus earned. In the sample, the Garcia kitchen is 81.9% complete on $39,640 revenue: $32,461 earned, $31,712 invoiced, $749 under billed.

How is projected profit worked out?

For an open job it is revenue minus the larger of the budget and the cost so far, so the number assumes the rest of the job comes in on budget and gets worse the moment you overrun. For a Complete or Closed job it is revenue minus actual cost. A job with no budget entered shows revenue minus cost so far.

Does it show net profit after overhead?

It shows a projected net line: projected gross profit minus your overhead % of revenue from Settings (10% in the sample). It is a flat percentage, not your real rent, office staff and insurance bills; keep those in your bookkeeping.

Can I rename or add cost categories?

Rename the seven in Settings before you log costs; the Jobs budget columns and headers, Costs dropdown and Dashboard follow by position. Keep Labor first, since the Time Log posts to it. Costs logged under an old name show on the 'Not matched to a category' line until you re-pick them. The seven slots are fixed: an eighth category needs a new budget column on Jobs and a new row in the Dashboard's budget vs actual table.

Does the chart show all my jobs?

Yes. The revenue vs cost chart covers all 15 job slots, labeled by job ID. Empty slots stay blank until you add the job.

Job Cost Tracker for Contractors

$13 one-time · instant download · 14-day refund